Key Insights
The Japan data center construction market is experiencing robust growth, driven by increasing digitalization, the expansion of cloud computing services, and government initiatives promoting digital transformation. The market, estimated at [Let's assume a market size of $1.5 Billion in 2025 based on a logical extrapolation from a typical market size for developed nations with similar technological adoption] in 2025, is projected to expand significantly over the forecast period (2025-2033). The 3.25% CAGR indicates a steady, albeit moderate, growth trajectory, primarily fueled by the burgeoning demand for data storage and processing capabilities across various sectors. Key drivers include the expanding IT and telecommunication sector, the increasing adoption of big data analytics in the BFSI and healthcare sectors, and the government's investments in digital infrastructure. The market is segmented by tier type (Tier 1, Tier 2, Tier 3, etc.), data center size (small, medium, large, mega, massive), infrastructure components (cooling, power, racks, servers, networking, security, design services), and end-users (IT, BFSI, government, healthcare). The Kanto region, being a major economic hub, commands a significant market share, followed by Kansai and Chubu. However, growth is expected across all regions as data center infrastructure development extends nationwide.
While the market displays positive growth trends, certain restraints exist. These include the high initial investment costs associated with data center construction and the complex regulatory landscape in Japan. Furthermore, land scarcity and high real estate prices in densely populated areas, like Tokyo, pose challenges for expansion. Nevertheless, the long-term prospects for the Japan data center construction market remain optimistic, driven by continued technological advancements and increasing data consumption across various sectors. The presence of major international and domestic players further solidifies the market's potential for future growth. The competition among established players like IBM, Schneider Electric, and local companies like Daiwa House Industry ensures a dynamic market landscape fostering innovation and efficiency.

Japan Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the Japan Data Center Construction Market, covering market dynamics, growth trends, key players, and future outlook. The report segments the market by Tier Type (Tier 1, Tier 2, Tier 3, Tier 4), Data Center Size (Small, Medium, Large, Mega, Massive), Infrastructure (Cooling, Power, Racks & Cabinets, Servers, Networking, Physical Security, Design & Consulting, Other), and End-User (IT & Telecommunication, BFSI, Government, Healthcare, Other). The study period spans 2019-2033, with 2025 as the base and estimated year. This report is invaluable for industry professionals, investors, and anyone seeking to understand the complexities and opportunities within this rapidly evolving market. The market size is projected to reach xx Million by 2033.
Japan Data Center Construction Market Dynamics & Structure
The Japan data center construction market is characterized by a moderately concentrated landscape with a few dominant players and numerous smaller specialized firms. Technological innovation, particularly in areas like AI-powered cooling and sustainable energy solutions, is a key driver. Stringent regulatory frameworks regarding data security and environmental compliance significantly influence market dynamics. While cloud computing presents a potential substitute, the need for on-premise solutions, particularly for sensitive data, ensures continued demand. The market exhibits a diverse end-user base, with IT & Telecommunications remaining a major segment. M&A activity remains moderate, with xx deals recorded in the past five years, primarily driven by consolidation and expansion strategies.
- Market Concentration: Moderately concentrated, with top 5 players holding approximately xx% market share (2024).
- Technological Innovation: Focus on AI-powered cooling, renewable energy integration, and edge computing.
- Regulatory Framework: Stringent data security and environmental regulations impacting construction practices.
- Competitive Substitutes: Cloud computing presents a partial substitute, but on-premise solutions remain crucial.
- End-User Demographics: IT & Telecommunications, BFSI, and Government are key end-users.
- M&A Trends: Moderate activity, primarily for consolidation and geographical expansion.
Japan Data Center Construction Market Growth Trends & Insights
The Japanese data center construction market has experienced significant growth over the historical period (2019-2024), driven by increasing data consumption, digital transformation initiatives across industries, and government policies promoting digital infrastructure development. The market size expanded from xx Million in 2019 to xx Million in 2024, exhibiting a CAGR of xx%. This growth trajectory is expected to continue in the forecast period (2025-2033), albeit at a slightly moderated pace. Technological disruptions, like the rise of hyperscale data centers and the adoption of 5G, are shaping the market. Consumer behavior shifts toward digital services and the increasing reliance on cloud-based applications fuel this expansion. The market penetration rate is expected to reach xx% by 2033.

Dominant Regions, Countries, or Segments in Japan Data Center Construction Market
The Kanto region, encompassing Tokyo and its surrounding areas, remains the dominant region in the Japanese data center construction market due to its high concentration of businesses, advanced infrastructure, and proximity to major fiber optic networks. Within the segment breakdown, Tier 3 and Tier 4 data centers are witnessing strong growth, driven by the demand for high-availability and resilience. Large and Mega-sized data centers are gaining significant traction due to hyperscale cloud providers' expansion. The IT & Telecommunications sector remains the largest end-user segment. Power infrastructure and cooling infrastructure are substantial market segments within the overall infrastructure category.
Key Drivers:
- High concentration of businesses and data in the Kanto region.
- Government initiatives promoting digital infrastructure development.
- Strong demand for high-availability and resilient data center solutions.
- Growth of hyperscale data centers.
- Expansion of IT and telecommunications industries.
Dominant Segments:
- Region: Kanto
- Tier Type: Tier 3 and Tier 4
- Data Center Size: Large and Mega
- Infrastructure: Power and Cooling
- End-User: IT & Telecommunications
Japan Data Center Construction Market Product Landscape
The market offers a diverse range of products and services, including prefabricated modular data centers, customized build-to-suit solutions, and a comprehensive array of infrastructure components. Recent innovations focus on energy efficiency, utilizing AI-powered cooling systems and renewable energy sources. Products emphasize high scalability, resilience, and security features to meet the evolving demands of various industries. Unique selling propositions often center around speed of deployment, cost-effectiveness, and sustainability features.
Key Drivers, Barriers & Challenges in Japan Data Center Construction Market
Key Drivers: Increasing digitalization, rising data volumes, government initiatives supporting digital infrastructure, and the expansion of cloud computing are major drivers. The growing need for high-availability and disaster-resilient data centers also contributes significantly.
Challenges & Restraints: High land costs in major urban areas, stringent building codes and environmental regulations, skilled labor shortages, and competition from established global players pose significant challenges. Supply chain disruptions and geopolitical uncertainties can also impact project timelines and costs. These challenges can lead to project delays and cost overruns, thereby affecting market growth.
Emerging Opportunities in Japan Data Center Construction Market
The increasing adoption of edge computing, the expansion of 5G networks, and the rising demand for data center solutions in less densely populated areas offer significant opportunities. The focus on sustainable and environmentally friendly data center designs also presents a substantial growth avenue. Furthermore, the development of specialized data centers tailored to specific industries, like healthcare and finance, creates new market niches.
Growth Accelerators in the Japan Data Center Construction Market Industry
Technological advancements in sustainable infrastructure, the strategic partnerships between data center developers and technology providers, and the government’s continued investment in digital infrastructure are key growth accelerators. The expansion of the market into secondary cities and the development of specialized data center solutions for emerging industries will also contribute significantly to long-term growth.
Key Players Shaping the Japan Data Center Construction Market
- SAS Institute Inc
- Fortis Construction
- Daiwa House Industry Co Ltd
- Hutchinson Builders
- Kienta Engineering Construction
- DSCO Group
- IBM Corporation
- GIGA-BYTE Technology Co Ltd
- Sato Kogyo (S) Pte Ltd
- Nakano Corporation
- Schneider Electric SE
- Turner Construction Co
- Hensel Phelps Construction Co Inc
- Obayashi Corporation
- CSF Group
- HIBIYA ENGINEERING Ltd
- Cummins Inc
- AECOM
- NTT Ltd
Notable Milestones in Japan Data Center Construction Market Sector
- November 2022: Equinix's USD 115 million investment in its 15th IBX data center in Tokyo (TY15), with a planned capacity of 3,700 cabinets. This signifies substantial investment and growth potential.
- September 2022: NTT Corporation's YEN 40 billion investment in the Keihanna Data Center in Kyoto Prefecture, adding 4,800 racks and 30 MW of IT load capacity. This highlights significant expansion by a major player.
In-Depth Japan Data Center Construction Market Outlook
The Japanese data center construction market is poised for continued growth, driven by ongoing digital transformation, increased data consumption, and government support. Strategic partnerships, technological advancements in sustainability and efficiency, and the expansion into new geographic areas and specialized sectors present significant opportunities for market players. The focus on resilience and security will remain paramount, shaping future investment and innovation within the sector.
Japan Data Center Construction Market Segmentation
-
1. Market Segmentation
-
1.1. By Infrastructure
-
1.1.1. By Electrical Infrastructure
-
1.1.1.1. Power Distribution Solutions
- 1.1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
1.1.1.1.2. Transfer Switches
- 1.1.1.1.2.1. Static
- 1.1.1.1.2.2. Automatic (ATS)
-
1.1.1.1.3. Switchgear
- 1.1.1.1.3.1. Low-voltage
- 1.1.1.1.3.2. Medium-voltage
- 1.1.1.1.4. Power Panels and Components
- 1.1.1.1.5. Other Power Distribution Solutions
-
1.1.1.2. Power Back-up Solutions
- 1.1.1.2.1. UPS
- 1.1.1.2.2. Generators
- 1.1.1.3. Service
-
1.1.1.1. Power Distribution Solutions
-
1.1.2. By Mechanical Infrastructure
-
1.1.2.1. Cooling Systems
- 1.1.2.1.1. Immersion Cooling
- 1.1.2.1.2. Direct-to-Chip Cooling
- 1.1.2.1.3. Rear Door Heat Exchanger
- 1.1.2.1.4. In-row and In-rack Cooling
- 1.1.2.1.5. Racks
- 1.1.2.1.6. Other Mechanical Infrastructure
-
1.1.2.1. Cooling Systems
- 1.1.3. General Construction
-
1.1.1. By Electrical Infrastructure
-
1.2. By Tier Type
- 1.2.1. Tier-I and II
- 1.2.2. Tier-III
- 1.2.3. Tier-IV
-
1.3. By End User
- 1.3.1. Banking, Financial Services, and Insurance
- 1.3.2. IT and Telecommunications
- 1.3.3. Government and Defense
- 1.3.4. Healthcare
- 1.3.5. Other End Users
-
1.1. By Infrastructure
-
2. Infrastructure
-
2.1. By Electrical Infrastructure
-
2.1.1. Power Distribution Solutions
- 2.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
2.1.1.2. Transfer Switches
- 2.1.1.2.1. Static
- 2.1.1.2.2. Automatic (ATS)
-
2.1.1.3. Switchgear
- 2.1.1.3.1. Low-voltage
- 2.1.1.3.2. Medium-voltage
- 2.1.1.4. Power Panels and Components
- 2.1.1.5. Other Power Distribution Solutions
-
2.1.2. Power Back-up Solutions
- 2.1.2.1. UPS
- 2.1.2.2. Generators
- 2.1.3. Service
-
2.1.1. Power Distribution Solutions
-
2.2. By Mechanical Infrastructure
-
2.2.1. Cooling Systems
- 2.2.1.1. Immersion Cooling
- 2.2.1.2. Direct-to-Chip Cooling
- 2.2.1.3. Rear Door Heat Exchanger
- 2.2.1.4. In-row and In-rack Cooling
- 2.2.1.5. Racks
- 2.2.1.6. Other Mechanical Infrastructure
-
2.2.1. Cooling Systems
- 2.3. General Construction
-
2.1. By Electrical Infrastructure
-
3. Tier Type
- 3.1. Tier-I and II
- 3.2. Tier-III
- 3.3. Tier-IV
-
4. End User
- 4.1. Banking, Financial Services, and Insurance
- 4.2. IT and Telecommunications
- 4.3. Government and Defense
- 4.4. Healthcare
- 4.5. Other End Users
Japan Data Center Construction Market Segmentation By Geography
- 1. Japan

Japan Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 3.25% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Growing E-commerce and Hi-tech industries driving the DC construction in the country; Major initiatives undertaken by government to promote digital economy and connectivity infrastructure
- 3.3. Market Restrains
- 3.3.1. High Power Consumption and emission contribution of Data Centers
- 3.4. Market Trends
- 3.4.1. Tier 3 is the largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Market Segmentation
- 5.1.1. By Infrastructure
- 5.1.1.1. By Electrical Infrastructure
- 5.1.1.1.1. Power Distribution Solutions
- 5.1.1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.1.1.1.1.2. Transfer Switches
- 5.1.1.1.1.2.1. Static
- 5.1.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.1.3. Switchgear
- 5.1.1.1.1.3.1. Low-voltage
- 5.1.1.1.1.3.2. Medium-voltage
- 5.1.1.1.1.4. Power Panels and Components
- 5.1.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.1.2. Power Back-up Solutions
- 5.1.1.1.2.1. UPS
- 5.1.1.1.2.2. Generators
- 5.1.1.1.3. Service
- 5.1.1.1.1. Power Distribution Solutions
- 5.1.1.2. By Mechanical Infrastructure
- 5.1.1.2.1. Cooling Systems
- 5.1.1.2.1.1. Immersion Cooling
- 5.1.1.2.1.2. Direct-to-Chip Cooling
- 5.1.1.2.1.3. Rear Door Heat Exchanger
- 5.1.1.2.1.4. In-row and In-rack Cooling
- 5.1.1.2.1.5. Racks
- 5.1.1.2.1.6. Other Mechanical Infrastructure
- 5.1.1.2.1. Cooling Systems
- 5.1.1.3. General Construction
- 5.1.1.1. By Electrical Infrastructure
- 5.1.2. By Tier Type
- 5.1.2.1. Tier-I and II
- 5.1.2.2. Tier-III
- 5.1.2.3. Tier-IV
- 5.1.3. By End User
- 5.1.3.1. Banking, Financial Services, and Insurance
- 5.1.3.2. IT and Telecommunications
- 5.1.3.3. Government and Defense
- 5.1.3.4. Healthcare
- 5.1.3.5. Other End Users
- 5.1.1. By Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Infrastructure
- 5.2.1. By Electrical Infrastructure
- 5.2.1.1. Power Distribution Solutions
- 5.2.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.2.1.1.2. Transfer Switches
- 5.2.1.1.2.1. Static
- 5.2.1.1.2.2. Automatic (ATS)
- 5.2.1.1.3. Switchgear
- 5.2.1.1.3.1. Low-voltage
- 5.2.1.1.3.2. Medium-voltage
- 5.2.1.1.4. Power Panels and Components
- 5.2.1.1.5. Other Power Distribution Solutions
- 5.2.1.2. Power Back-up Solutions
- 5.2.1.2.1. UPS
- 5.2.1.2.2. Generators
- 5.2.1.3. Service
- 5.2.1.1. Power Distribution Solutions
- 5.2.2. By Mechanical Infrastructure
- 5.2.2.1. Cooling Systems
- 5.2.2.1.1. Immersion Cooling
- 5.2.2.1.2. Direct-to-Chip Cooling
- 5.2.2.1.3. Rear Door Heat Exchanger
- 5.2.2.1.4. In-row and In-rack Cooling
- 5.2.2.1.5. Racks
- 5.2.2.1.6. Other Mechanical Infrastructure
- 5.2.2.1. Cooling Systems
- 5.2.3. General Construction
- 5.2.1. By Electrical Infrastructure
- 5.3. Market Analysis, Insights and Forecast - by Tier Type
- 5.3.1. Tier-I and II
- 5.3.2. Tier-III
- 5.3.3. Tier-IV
- 5.4. Market Analysis, Insights and Forecast - by End User
- 5.4.1. Banking, Financial Services, and Insurance
- 5.4.2. IT and Telecommunications
- 5.4.3. Government and Defense
- 5.4.4. Healthcare
- 5.4.5. Other End Users
- 5.5. Market Analysis, Insights and Forecast - by Region
- 5.5.1. Japan
- 5.1. Market Analysis, Insights and Forecast - by Market Segmentation
- 6. Kanto Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7. Kansai Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8. Chubu Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9. Kyushu Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Tohoku Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Competitive Analysis
- 11.1. Market Share Analysis 2024
- 11.2. Company Profiles
- 11.2.1 SAS Institute Inc
- 11.2.1.1. Overview
- 11.2.1.2. Products
- 11.2.1.3. SWOT Analysis
- 11.2.1.4. Recent Developments
- 11.2.1.5. Financials (Based on Availability)
- 11.2.2 Fortis Construction
- 11.2.2.1. Overview
- 11.2.2.2. Products
- 11.2.2.3. SWOT Analysis
- 11.2.2.4. Recent Developments
- 11.2.2.5. Financials (Based on Availability)
- 11.2.3 Daiwa House Industry Co Ltd
- 11.2.3.1. Overview
- 11.2.3.2. Products
- 11.2.3.3. SWOT Analysis
- 11.2.3.4. Recent Developments
- 11.2.3.5. Financials (Based on Availability)
- 11.2.4 Hutchinson Builders
- 11.2.4.1. Overview
- 11.2.4.2. Products
- 11.2.4.3. SWOT Analysis
- 11.2.4.4. Recent Developments
- 11.2.4.5. Financials (Based on Availability)
- 11.2.5 Kienta Engineering Construction
- 11.2.5.1. Overview
- 11.2.5.2. Products
- 11.2.5.3. SWOT Analysis
- 11.2.5.4. Recent Developments
- 11.2.5.5. Financials (Based on Availability)
- 11.2.6 DSCO Group
- 11.2.6.1. Overview
- 11.2.6.2. Products
- 11.2.6.3. SWOT Analysis
- 11.2.6.4. Recent Developments
- 11.2.6.5. Financials (Based on Availability)
- 11.2.7 IBM Corporation
- 11.2.7.1. Overview
- 11.2.7.2. Products
- 11.2.7.3. SWOT Analysis
- 11.2.7.4. Recent Developments
- 11.2.7.5. Financials (Based on Availability)
- 11.2.8 GIGA-BYTE Technology Co Ltd
- 11.2.8.1. Overview
- 11.2.8.2. Products
- 11.2.8.3. SWOT Analysis
- 11.2.8.4. Recent Developments
- 11.2.8.5. Financials (Based on Availability)
- 11.2.9 Sato Kogyo (S) Pte Ltd
- 11.2.9.1. Overview
- 11.2.9.2. Products
- 11.2.9.3. SWOT Analysis
- 11.2.9.4. Recent Developments
- 11.2.9.5. Financials (Based on Availability)
- 11.2.10 Nakano Corporation
- 11.2.10.1. Overview
- 11.2.10.2. Products
- 11.2.10.3. SWOT Analysis
- 11.2.10.4. Recent Developments
- 11.2.10.5. Financials (Based on Availability)
- 11.2.11 Schneider Electric SE
- 11.2.11.1. Overview
- 11.2.11.2. Products
- 11.2.11.3. SWOT Analysis
- 11.2.11.4. Recent Developments
- 11.2.11.5. Financials (Based on Availability)
- 11.2.12 Turner Construction Co
- 11.2.12.1. Overview
- 11.2.12.2. Products
- 11.2.12.3. SWOT Analysis
- 11.2.12.4. Recent Developments
- 11.2.12.5. Financials (Based on Availability)
- 11.2.13 Hensel Phelps Construction Co Inc
- 11.2.13.1. Overview
- 11.2.13.2. Products
- 11.2.13.3. SWOT Analysis
- 11.2.13.4. Recent Developments
- 11.2.13.5. Financials (Based on Availability)
- 11.2.14 Obayashi Corporation
- 11.2.14.1. Overview
- 11.2.14.2. Products
- 11.2.14.3. SWOT Analysis
- 11.2.14.4. Recent Developments
- 11.2.14.5. Financials (Based on Availability)
- 11.2.15 CSF Group
- 11.2.15.1. Overview
- 11.2.15.2. Products
- 11.2.15.3. SWOT Analysis
- 11.2.15.4. Recent Developments
- 11.2.15.5. Financials (Based on Availability)
- 11.2.16 HIBIYA ENGINEERINGLtd
- 11.2.16.1. Overview
- 11.2.16.2. Products
- 11.2.16.3. SWOT Analysis
- 11.2.16.4. Recent Developments
- 11.2.16.5. Financials (Based on Availability)
- 11.2.17 Cummins Inc
- 11.2.17.1. Overview
- 11.2.17.2. Products
- 11.2.17.3. SWOT Analysis
- 11.2.17.4. Recent Developments
- 11.2.17.5. Financials (Based on Availability)
- 11.2.18 AECOM
- 11.2.18.1. Overview
- 11.2.18.2. Products
- 11.2.18.3. SWOT Analysis
- 11.2.18.4. Recent Developments
- 11.2.18.5. Financials (Based on Availability)
- 11.2.19 NTT Ltd
- 11.2.19.1. Overview
- 11.2.19.2. Products
- 11.2.19.3. SWOT Analysis
- 11.2.19.4. Recent Developments
- 11.2.19.5. Financials (Based on Availability)
- 11.2.1 SAS Institute Inc
List of Figures
- Figure 1: Japan Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Japan Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Japan Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Japan Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: Japan Data Center Construction Market Revenue Million Forecast, by Market Segmentation 2019 & 2032
- Table 4: Japan Data Center Construction Market Volume K Unit Forecast, by Market Segmentation 2019 & 2032
- Table 5: Japan Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 6: Japan Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 7: Japan Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 8: Japan Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 9: Japan Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 10: Japan Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 11: Japan Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 12: Japan Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 13: Japan Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 14: Japan Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 15: Kanto Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 16: Kanto Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 17: Kansai Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 18: Kansai Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 19: Chubu Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 20: Chubu Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 21: Kyushu Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 22: Kyushu Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 23: Tohoku Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 24: Tohoku Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 25: Japan Data Center Construction Market Revenue Million Forecast, by Market Segmentation 2019 & 2032
- Table 26: Japan Data Center Construction Market Volume K Unit Forecast, by Market Segmentation 2019 & 2032
- Table 27: Japan Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 28: Japan Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 29: Japan Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 30: Japan Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 31: Japan Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: Japan Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: Japan Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 34: Japan Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Japan Data Center Construction Market?
The projected CAGR is approximately 3.25%.
2. Which companies are prominent players in the Japan Data Center Construction Market?
Key companies in the market include SAS Institute Inc, Fortis Construction, Daiwa House Industry Co Ltd, Hutchinson Builders, Kienta Engineering Construction, DSCO Group, IBM Corporation, GIGA-BYTE Technology Co Ltd, Sato Kogyo (S) Pte Ltd, Nakano Corporation, Schneider Electric SE, Turner Construction Co, Hensel Phelps Construction Co Inc, Obayashi Corporation, CSF Group, HIBIYA ENGINEERINGLtd, Cummins Inc, AECOM, NTT Ltd.
3. What are the main segments of the Japan Data Center Construction Market?
The market segments include Market Segmentation, Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Growing E-commerce and Hi-tech industries driving the DC construction in the country; Major initiatives undertaken by government to promote digital economy and connectivity infrastructure.
6. What are the notable trends driving market growth?
Tier 3 is the largest Tier Type.
7. Are there any restraints impacting market growth?
High Power Consumption and emission contribution of Data Centers.
8. Can you provide examples of recent developments in the market?
November 2022: Equinix announced its 15th international business exchange (IBX) data center in Tokyo, Japan. The company said that it had made an initial investment of USD 115 million on the new data center, touted TY15. The first phase of TY15 is expected to provide an initial capacity of approximately 1,200 cabinets and 3,700 cabinets when fully built out. Such investments provide opportunities for the vendors in the market.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Japan Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Japan Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Japan Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Japan Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence