Key Insights
The Mexico data center construction market exhibits robust growth potential, driven by increasing digitalization, cloud adoption, and the expansion of e-commerce and related digital services. The market's Compound Annual Growth Rate (CAGR) of 7.13% from 2019 to 2024 indicates a strong upward trajectory. This growth is fueled by significant investments from both domestic and international companies looking to establish a presence in Mexico's expanding economy. Key segments driving this expansion include IT & Telecommunication, BFSI (Banking, Financial Services, and Insurance), and the Government sector, all demanding advanced data center infrastructure to support their operational needs. The prevalent use of electrical infrastructure within data centers is a significant factor contributing to the market's size. While specific market size figures for 2025 are unavailable, projecting forward from the provided historical data and CAGR, a reasonable estimate would place the market value in the hundreds of millions of USD in 2025. Construction companies like Clune Construction, IBM, and others are actively involved in developing this sector, further solidifying its growth trajectory. However, potential restraints like regulatory hurdles and infrastructure limitations in certain regions could impact growth rate.
Looking ahead to 2033, the continued expansion of the digital economy in Mexico will ensure sustained growth. The demand for resilient and scalable data center infrastructure will likely attract further investment, leading to an even larger market size. Furthermore, the increasing adoption of green initiatives in the construction sector, focusing on energy efficiency and sustainable materials, will be a key factor shaping future developments in the Mexican data center construction market. Companies specializing in sustainable solutions will gain a competitive edge. Strategic partnerships and mergers and acquisitions are likely to be prevalent amongst construction and technology companies looking to capitalize on the market's opportunities. The continued growth hinges on addressing potential challenges such as skilled labor shortages and ensuring reliable power supply to meet the increasing energy demands of data centers.

Mexico Data Center Construction Market: A Comprehensive Report (2019-2033)
This meticulously researched report provides a detailed analysis of the Mexico Data Center Construction Market, offering invaluable insights for industry professionals, investors, and stakeholders. With a comprehensive study period spanning from 2019 to 2033, including a historical period (2019-2024), base year (2025), and forecast period (2025-2033), this report offers a complete overview of this dynamic market. The report segments the market by infrastructure (Electrical Infrastructure, Other Electrical Infrastructures, Mechanical Infrastructure, Other Mechanical Infrastructures, Other Infrastructure) and end-user (IT & Telecommunication, BFSI, Government, Healthcare, Other End Users), providing granular insights into market dynamics.
Mexico Data Center Construction Market Dynamics & Structure
The Mexico data center construction market exhibits a moderately concentrated landscape, with several key players vying for market share. Technological innovation, particularly in areas like sustainable energy solutions and advanced cooling systems, is a primary growth driver. The regulatory environment, while evolving, presents both opportunities and challenges for market participants. Substitute products, such as cloud computing services, exert some competitive pressure, although the demand for on-premise data centers remains robust. The end-user demographic is diversifying, with increasing adoption across sectors like BFSI, government, and healthcare. M&A activity is expected to increase, driven by consolidation and expansion strategies, with an estimated xx number of deals in the last 5 years resulting in a xx% increase in market consolidation.
- Market Concentration: Moderately concentrated, with top 5 players holding approximately xx% market share in 2024.
- Technological Innovation: Focus on sustainable designs, AI-powered management systems, and improved cooling efficiency.
- Regulatory Framework: Government initiatives promoting digital infrastructure development influence market growth.
- Competitive Substitutes: Cloud services present a competitive alternative, but on-premise solutions maintain strong demand.
- End-User Demographics: Diversification across sectors, with IT & Telecommunications, BFSI, and Government representing major segments.
- M&A Trends: Consolidation expected to accelerate, driven by strategic expansion and market share gains.
Mexico Data Center Construction Market Growth Trends & Insights
The Mexico data center construction market is experiencing significant growth, fueled by increasing digitalization, robust economic expansion, and supportive government policies. The market size expanded from xx Million in 2019 to xx Million in 2024, exhibiting a Compound Annual Growth Rate (CAGR) of xx%. This robust expansion reflects the rising demand for data storage and processing capabilities across various sectors. Technological advancements, such as the adoption of edge computing and 5G networks, are further driving market growth. Consumer behavior shifts towards digital services and the increasing reliance on data-intensive applications are accelerating market adoption rates. Market penetration is expected to reach xx% by 2033, reflecting continued strong growth and investment in the sector.

Dominant Regions, Countries, or Segments in Mexico Data Center Construction Market
Mexico City and Guadalajara are the leading regions driving market growth, benefiting from established IT hubs, strong infrastructure, and supportive government initiatives. The IT & Telecommunication sector represents the largest end-user segment, driving a significant portion of market demand. The high adoption of cloud computing, however, limits growth in other sectors like Healthcare and BFSI, while Government and Other End Users will see a continued increase in demand for data center construction projects. Within the infrastructure segment, Electrical Infrastructure holds the largest market share due to its crucial role in powering and securing data centers.
- Key Growth Drivers:
- Mexico City & Guadalajara: Established IT hubs, robust infrastructure, and government incentives.
- IT & Telecommunication: Highest demand for data center capacity due to digital transformation initiatives.
- Electrical Infrastructure: Crucial for power supply and security, driving the largest segment share.
Mexico Data Center Construction Market Product Landscape
The Mexico data center construction market features a diverse product landscape, including prefabricated modular data centers, custom-built facilities, and specialized infrastructure solutions. These solutions emphasize scalability, energy efficiency, and enhanced security features, aligning with the evolving demands of the industry. Key innovations include AI-powered monitoring systems, advanced cooling technologies, and sustainable design principles, all aimed at optimizing operational efficiency and minimizing environmental impact.
Key Drivers, Barriers & Challenges in Mexico Data Center Construction Market
Key Drivers: Increasing digitalization across sectors, supportive government policies promoting digital infrastructure development, and the rising demand for data storage and processing capacity are key drivers. The expansion of cloud computing and edge computing also fosters growth.
Key Challenges: High initial investment costs, limited skilled labor availability, and the need for robust power infrastructure can hinder market expansion. Regulatory hurdles and potential supply chain disruptions pose additional challenges. These challenges could impact growth by approximately xx% by 2030 if not adequately addressed.
Emerging Opportunities in Mexico Data Center Construction Market
The growing adoption of hyperscale data centers, the expansion of 5G networks, and increasing demand for edge computing present significant opportunities. Untapped markets in smaller cities and regions also hold potential for growth. Innovative approaches like modular data centers and sustainable design principles are gaining traction, creating new business avenues.
Growth Accelerators in the Mexico Data Center Construction Market Industry
Strategic partnerships between technology providers and construction companies are crucial for accelerating market growth. Technological breakthroughs in areas such as AI-powered infrastructure management and sustainable energy solutions further enhance efficiency and appeal. Government initiatives supporting the development of digital infrastructure, coupled with private sector investments, are playing a pivotal role in propelling the market forward.
Key Players Shaping the Mexico Data Center Construction Market Market
- Clune Construction Company LP
- IBM Corporation
- Holder Construction Company
- ALFA LAVAL AB
- Schneider Electric SE
- Turner Construction Co
- Hensel Phelps Construction Co Inc
- Dell Inc
- DPR CONSTRUCTION INC
- Brookfield Infrastructure Partners L P
- Danfoss A/S
- Rittal GMBH & Co KG
- AECOM
- HITT Contrating Inc
- Fortis ConstructionInc
Notable Milestones in Mexico Data Center Construction Market Sector
- November 2022: Kio Networks' acquisition of KIO MEX6 campus, a 50,000-square-meter data center with 20 MW capacity, significantly expanded data center capacity in the Mexico City Metro area.
- September 2022: TELMEX-Triara's partnership with Oracle to launch a second Oracle Cloud Region in Mexico demonstrates growing cloud infrastructure investment and the expansion of data center services.
In-Depth Mexico Data Center Construction Market Market Outlook
The future of the Mexico data center construction market appears exceptionally promising. Continued digital transformation, government support, and private sector investments will fuel sustained growth. Strategic opportunities exist in developing sustainable data centers, expanding into underserved regions, and leveraging technological advancements to improve efficiency and reduce operational costs. The market is poised for substantial expansion, driven by these factors, offering significant potential for investors and market participants alike.
Mexico Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched Solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier-I and II
- 11.2. Tier-III
- 11.3. Tier-IV
- 12. Tier-I and II
- 13. Tier-III
- 14. Tier-IV
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Mexico Data Center Construction Market Segmentation By Geography
- 1. Mexico

Mexico Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 7.13% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1 9.1 Growing Cloud Applications
- 3.2.2 AI
- 3.2.3 and Big Data9.2 Growing Adoption of Hyperscale Data Centers in Large Enterprises9.3 Advent Green Data Center
- 3.3. Market Restrains
- 3.3.1 10.1 High CaPex
- 3.3.2 OpEx & TCO for building Data Center
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Mexico Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier-I and II
- 5.11.2. Tier-III
- 5.11.3. Tier-IV
- 5.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 5.13. Market Analysis, Insights and Forecast - by Tier-III
- 5.14. Market Analysis, Insights and Forecast - by Tier-IV
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Mexico
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Clune Construction Company LP
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 IBM Corporation
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Holder Construction Company
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 ALFA LAVAL AB
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Schneider Electric SE
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Turner Construction Co
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Hensel Phelps Construction Co Inc
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Dell Inc
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 DPR CONSTRUCTION INC
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Brookfield Infrastructure Partners L P
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Danfoss A/S
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Rittal GMBH & Co KG
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 AECOM
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 HITT Contrating Inc
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 Fortis ConstructionInc
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.1 Clune Construction Company LP
List of Figures
- Figure 1: Mexico Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Mexico Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Mexico Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Mexico Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Mexico Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Mexico Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Mexico Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Mexico Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Mexico Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Mexico Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Mexico Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Mexico Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Mexico Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Mexico Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Mexico Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 14: Mexico Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 15: Mexico Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 16: Mexico Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Mexico Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Mexico Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Mexico Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Mexico Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Mexico Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Mexico Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 23: Mexico Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: Mexico Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 25: Mexico Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 26: Mexico Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 27: Mexico Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 28: Mexico Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 29: Mexico Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 30: Mexico Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 31: Mexico Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 32: Mexico Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 33: Mexico Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 34: Mexico Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 35: Mexico Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 36: Mexico Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 37: Mexico Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 38: Mexico Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 39: Mexico Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 40: Mexico Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 41: Mexico Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 42: Mexico Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 43: Mexico Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 44: Mexico Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Mexico Data Center Construction Market?
The projected CAGR is approximately 7.13%.
2. Which companies are prominent players in the Mexico Data Center Construction Market?
Key companies in the market include Clune Construction Company LP, IBM Corporation, Holder Construction Company, ALFA LAVAL AB, Schneider Electric SE, Turner Construction Co, Hensel Phelps Construction Co Inc, Dell Inc, DPR CONSTRUCTION INC, Brookfield Infrastructure Partners L P, Danfoss A/S, Rittal GMBH & Co KG, AECOM, HITT Contrating Inc, Fortis ConstructionInc.
3. What are the main segments of the Mexico Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier-I and II, Tier-III, Tier-IV, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Growing Cloud Applications. AI. and Big Data9.2 Growing Adoption of Hyperscale Data Centers in Large Enterprises9.3 Advent Green Data Center.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
10.1 High CaPex. OpEx & TCO for building Data Center.
8. Can you provide examples of recent developments in the market?
November 2022: Kio Networks has purchased a new campus of data centers in the greater Mexico City Metro area. The campus, known as KIO MEX6, has a 50,000-square-meter building with a 20 MW energy capacity and the ability to house operations and essential communications and IT services.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Mexico Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Mexico Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Mexico Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Mexico Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence