Key Insights
The Israel data center construction market is experiencing robust growth, fueled by a burgeoning digital economy and increasing demand for cloud services. The 9.55% CAGR (2019-2033) reflects a significant expansion, driven primarily by the IT & Telecommunication sector, followed by BFSI and Government organizations. The rise of big data analytics, the adoption of 5G technology, and the growing need for high-performance computing are key drivers. Trends indicate a shift towards sustainable data center design, incorporating renewable energy sources and optimized cooling systems to meet environmental regulations and reduce operational costs. While initial investment costs remain a restraint, the long-term return on investment associated with enhanced operational efficiency and increased business agility is incentivizing substantial growth. The market is segmented by infrastructure type (electrical and mechanical) and end-user industries. Major players such as ABB Ltd, Schneider Electric SE, and others are actively competing to secure a share of this expanding market. The presence of established construction companies like Fortis Construction and DPR Construction Inc. indicates significant activity in the physical construction aspects. The market’s growth is concentrated in urban areas with robust digital infrastructure, leading to strategic expansion by data center operators and increased competition amongst construction firms.
The forecast period (2025-2033) anticipates substantial market expansion, driven by consistent demand from various end-users. The increasing adoption of cloud computing, edge computing, and digital transformation initiatives will continue to propel the market. However, potential challenges such as land scarcity and energy costs could impact future growth trajectory. Government initiatives promoting digitalization and technological advancements are expected to mitigate these challenges and further stimulate market expansion. The market's competitive landscape is expected to remain active, with ongoing mergers, acquisitions, and strategic partnerships among construction firms, technology providers, and data center operators. This competitive dynamic will likely translate to innovative solutions and further accelerate the market's growth.

Israel Data Center Construction Market: A Comprehensive Report (2019-2033)
This comprehensive report provides an in-depth analysis of the Israel Data Center Construction Market, offering invaluable insights for industry professionals, investors, and strategic decision-makers. The report covers the period from 2019 to 2033, with a focus on the forecast period of 2025-2033 and a base year of 2025. The market is segmented by infrastructure (Electrical Infrastructure, Mechanical Infrastructure, Other Infrastructures), end-user (IT & Telecommunication, BFSI, Government, Healthcare, Other End Users), and parent market (Other Mechanical Infrastructures). Key players profiled include ABB Ltd, Fortis Construction, STULZ GMBH, Saan Zahav, Delta Group, Schneider Electric SE, Turner Construction Co, DPR Construction Inc, Caterpillar Inc, Rittal GmbH & Co KG, Delta Electronics, STULZ GMB, Mercury Engineering, AECOM Limited, Legrand, CyrusOne Inc, AECOM, Canovate Group, EAE Group, Alfa Laval AB, and M+W Group (Exyte).
Israel Data Center Construction Market Dynamics & Structure
The Israel Data Center Construction Market is characterized by moderate concentration, with a few large players and numerous smaller specialized firms. Technological innovation, driven by increasing demand for higher processing speeds and energy efficiency, is a key driver. Stringent regulatory frameworks regarding data security and environmental impact shape market practices. Competitive substitutes include cloud computing services, but the need for on-premise solutions for certain industries sustains market growth. The end-user demographics show a strong focus on the IT & Telecommunication and BFSI sectors, with increasing adoption in government and healthcare. M&A activity has been significant, with deals reflecting consolidation efforts and expansion strategies.
- Market Concentration: Moderately concentrated, with xx% market share held by the top 5 players in 2024.
- Technological Innovation: Driven by advancements in cooling technologies, power management systems, and virtualization.
- Regulatory Framework: Stringent data security and environmental regulations influencing construction practices.
- M&A Activity: Significant activity observed in recent years, with xx deals recorded between 2019 and 2024, totaling an estimated USD xx million.
Israel Data Center Construction Market Growth Trends & Insights
The Israel Data Center Construction Market is experiencing robust growth, driven by the increasing adoption of cloud computing, big data analytics, and the expansion of digital services across various sectors. The market size is projected to grow at a CAGR of xx% during the forecast period, reaching USD xx million by 2033. This growth is fueled by technological disruptions leading to higher capacity requirements and the need for more efficient data center infrastructure. Consumer behavior shifts towards digitalization are further boosting demand. Market penetration of advanced technologies, such as liquid cooling and AI-powered management systems, is expected to increase significantly. The IT and Telecommunication sector is the major driver, with xx% market share, followed by BFSI at xx% in 2024.

Dominant Regions, Countries, or Segments in Israel Data Center Construction Market
The Tel Aviv metropolitan area is currently the dominant region for data center construction in Israel due to its strong concentration of IT companies, established infrastructure, and supportive government policies. Other regions are experiencing growth but at a slower pace. Within the segmentation, the IT & Telecommunication sector dominates, accounting for xx% of the market in 2024, driven by high data processing demands and cloud adoption. The Electrical Infrastructure segment also holds significant importance, representing xx% of the market share in 2024, reflecting the crucial role of power and cooling systems in data center operations.
- Key Drivers: Supportive government policies, robust IT sector, strategic geographic location.
- Dominance Factors: High concentration of IT companies in Tel Aviv, existing infrastructure, skilled workforce.
- Growth Potential: Significant potential in secondary regions with growing IT infrastructure and digitalization.
Israel Data Center Construction Market Product Landscape
The market offers a range of products, from modular data centers to customized large-scale facilities. Innovations focus on energy efficiency, enhanced security features, and improved scalability. Key performance indicators include power usage effectiveness (PUE), mean time between failures (MTBF), and total cost of ownership (TCO). Unique selling propositions often center around sustainability, resilience, and tailored solutions to specific client needs. Technological advancements are driving the adoption of AI-powered management systems, liquid cooling technologies, and advanced security features.
Key Drivers, Barriers & Challenges in Israel Data Center Construction Market
Key Drivers: The burgeoning IT sector in Israel, government initiatives promoting digitalization, and increasing demand for data storage and processing capabilities are significant drivers. Furthermore, the need for robust and secure data infrastructure across various sectors fuels market expansion.
Challenges & Restraints: High construction costs, land scarcity, and potential regulatory hurdles can impede market growth. Supply chain disruptions and skilled labor shortages further pose challenges, potentially impacting project timelines and budgets by an estimated xx%.
Emerging Opportunities in Israel Data Center Construction Market
Emerging opportunities exist in the adoption of sustainable and energy-efficient technologies, such as renewable energy integration and innovative cooling methods. The growth of edge computing and the increasing demand for hyperscale data centers also present substantial potential. Furthermore, untapped markets in smaller cities and regions offer opportunities for expansion.
Growth Accelerators in the Israel Data Center Construction Market Industry
Technological advancements in data center infrastructure, strategic partnerships between technology providers and construction firms, and government incentives for digital infrastructure development are key growth accelerators. Expanding into new regions and focusing on sustainable and resilient solutions are also crucial for long-term market expansion.
Key Players Shaping the Israel Data Center Construction Market Market
- ABB Ltd
- Fortis Construction
- STULZ GMBH
- Saan Zahav
- Delta Group
- Schneider Electric SE
- Turner Construction Co
- DPR Construction Inc
- Caterpillar Inc
- Rittal GmbH & Co KG
- Delta Electronics
- STULZ GMB
- Mercury Engineering
- AECOM Limited
- Legrand
- CyrusOne Inc
- AECOM
- Canovate Group
- EAE Group
- Alfa Laval AB
- M+W Group (Exyte)
Notable Milestones in Israel Data Center Construction Market Sector
- August 2021: EdgeConneX acquired Global Data Center (GDC), adding two secure facilities to its platform.
- July 2022: Berkshire Partners invested USD 215 million in MedOne, signaling confidence in the market.
In-Depth Israel Data Center Construction Market Outlook
The Israel Data Center Construction Market is poised for sustained growth, driven by technological innovations, increasing digitalization, and government support. Strategic partnerships, expansion into new regions, and a focus on sustainable solutions will be crucial for capitalizing on future opportunities. The market presents significant potential for both established players and new entrants, offering lucrative prospects for those able to adapt to evolving technological landscapes and regulatory frameworks.
Israel Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Panels and Components
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-voltage
- 2.1.3.2. Medium-voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Panels and Components
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-voltage
- 3.3.2. Medium-voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Panels and Components
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 1 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 1 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Israel Data Center Construction Market Segmentation By Geography
- 1. Israel

Israel Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 9.55% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 9.1 Rising Adoption of Renewable Energy Sources9.2 Increase in 5G Deployments Fueling Edge Data Center Investments9.3 Smart City Initiatives Driving Data Center Investments
- 3.3. Market Restrains
- 3.3.1. 10.1 Security Challenges in Data Centers10.2 Location Constraints on the Development of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Israel Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Panels and Components
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-voltage
- 5.2.1.3.2. Medium-voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Panels and Components
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-voltage
- 5.3.3.2. Medium-voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Panels and Components
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 1 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Israel
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 ABB Ltd
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Fortis Construction
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 STULZ GMBH
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Saan Zahav
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Delta Group
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Schneider Electric SE
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Turner Construction Co
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 DPR Construction Inc
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Caterpillar Inc
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Rittal GmbH & Co KG
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Delta Electronics
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 STULZ GMB
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Mercury Engineering
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 AECOM Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 Legrand
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 CyrusOne Inc
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 AECOM
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.18 Canovate Group
- 6.2.18.1. Overview
- 6.2.18.2. Products
- 6.2.18.3. SWOT Analysis
- 6.2.18.4. Recent Developments
- 6.2.18.5. Financials (Based on Availability)
- 6.2.19 EAE Group
- 6.2.19.1. Overview
- 6.2.19.2. Products
- 6.2.19.3. SWOT Analysis
- 6.2.19.4. Recent Developments
- 6.2.19.5. Financials (Based on Availability)
- 6.2.20 Alfa Laval AB
- 6.2.20.1. Overview
- 6.2.20.2. Products
- 6.2.20.3. SWOT Analysis
- 6.2.20.4. Recent Developments
- 6.2.20.5. Financials (Based on Availability)
- 6.2.21 M+W Group (Exyte)
- 6.2.21.1. Overview
- 6.2.21.2. Products
- 6.2.21.3. SWOT Analysis
- 6.2.21.4. Recent Developments
- 6.2.21.5. Financials (Based on Availability)
- 6.2.1 ABB Ltd
List of Figures
- Figure 1: Israel Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Israel Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Israel Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Israel Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Israel Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Israel Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Israel Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Israel Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Israel Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Israel Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Israel Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Israel Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Israel Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Israel Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Israel Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 14: Israel Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Israel Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Israel Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Israel Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Israel Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Israel Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Israel Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Israel Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Israel Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 23: Israel Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: Israel Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 25: Israel Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 26: Israel Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 27: Israel Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 28: Israel Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 29: Israel Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 30: Israel Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 31: Israel Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 32: Israel Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 33: Israel Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 34: Israel Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 35: Israel Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 36: Israel Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 37: Israel Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 38: Israel Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 39: Israel Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 40: Israel Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 41: Israel Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 42: Israel Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 43: Israel Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 44: Israel Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Israel Data Center Construction Market?
The projected CAGR is approximately 9.55%.
2. Which companies are prominent players in the Israel Data Center Construction Market?
Key companies in the market include ABB Ltd, Fortis Construction, STULZ GMBH, Saan Zahav, Delta Group, Schneider Electric SE, Turner Construction Co, DPR Construction Inc, Caterpillar Inc, Rittal GmbH & Co KG, Delta Electronics, STULZ GMB, Mercury Engineering, AECOM Limited, Legrand, CyrusOne Inc, AECOM, Canovate Group, EAE Group, Alfa Laval AB, M+W Group (Exyte).
3. What are the main segments of the Israel Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Rising Adoption of Renewable Energy Sources9.2 Increase in 5G Deployments Fueling Edge Data Center Investments9.3 Smart City Initiatives Driving Data Center Investments.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
10.1 Security Challenges in Data Centers10.2 Location Constraints on the Development of Data Centers.
8. Can you provide examples of recent developments in the market?
July 2022: Berkshire Partners announced to pay more than USD 215 million to acquire a 49% stake in MedOne. The company was evaluated at NIS 1.5 billion (USD 430 Million).
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Israel Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Israel Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Israel Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Israel Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence